View Full Version : Automatic Waypoint Sequencing
tfarrell839
09-22-2013, 09:56 PM
I see in the latest software update that you added Automatic Waypoint Sequencing with the GTN series. What does that mean exactly? What capability has been added? Thanks.
Rob Hickman
09-23-2013, 09:15 AM
I see in the latest software update that you added Automatic Waypoint Sequencing with the GTN series. What does that mean exactly? What capability has been added? Thanks.
If the GTN is receiving baro corrected altitude data it will automatically sequence to the next waypoint if the current waypoint has an altitude requirement.
For example:
The departure procedure for KUAO has a climb to 700' on a heading before turning to the next waypoint. With the old software you would have to do a -D-> on the GTN after reaching 700ft.
tfarrell839
09-24-2013, 08:49 AM
Very Cool,
Thank you.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.